• Excellence achieved in Considerate Constructors audit
  • Excellence achieved in Considerate Constructors audit


Excellence achieved in Considerate Constructors audit

Date_ 6 September 2018

A Considerate Constructors Scheme Monitor recently visited Colley Lane Southern Access Road which resulted in Whitemountain achieving an ‘excellent standard’ well beyond the minimum requirements of the Scheme’s Code of Considerate Practice which is scored against each of the five headings:

•Care about Appearance

•Respect the Community

•Protect the Environment

•Secure everyone’s Safety

•Value their Workforce
 
In his report, the Scheme Monitor stated, ‘This was an excellent site with a close attention to detail in all respects of the CCS Checklist. The close working relationship with the Client and local residents provided an excellent platform to ensure that disruption to local businesses and residents was kept to a minimum’.

In his closing statement, the monitor added that, ‘the site rightly received an excellent score and the whole team should be congratulated in achieving quality targets in a timely manner’.

Congratulations to all the Whitemountain team on this achievement.